久久久91-久久久91精品国产一区二区-久久久91精品国产一区二区三区-久久久999国产精品-久久久999久久久精品

ABB
關(guān)注中國(guó)自動(dòng)化產(chǎn)業(yè)發(fā)展的先行者!
CAIAC 2025
2025工業(yè)安全大會(huì)
OICT公益講堂
當(dāng)前位置:首頁(yè) >> 案例 >> 案例首頁(yè)

案例頻道

福清核電時(shí)鐘系統(tǒng)可靠性研究與提升
  • 企業(yè):     領(lǐng)域:嵌入式系統(tǒng)    
  • 點(diǎn)擊數(shù):1743     發(fā)布時(shí)間:2019-12-31 11:45:48
  • 分享到:

作者:趙穎(福建福清核電有限公司,福建 福州 350300)

摘要:福清核電全廠時(shí)鐘系統(tǒng)作為電廠的授時(shí)母鐘,為涉網(wǎng)電氣系統(tǒng)、全廠DCS系統(tǒng)、汽輪機(jī)P320控制系統(tǒng)等重要電氣、儀控自動(dòng)控制設(shè)備提供時(shí)鐘基準(zhǔn)信號(hào)授時(shí),其可靠性對(duì)電廠自動(dòng)控制系統(tǒng)的安全穩(wěn)定運(yùn)行有著重要的意義。本文以福清核電時(shí)鐘系統(tǒng)為主線(xiàn),介紹福清核電1~4號(hào)機(jī)組時(shí)鐘系統(tǒng)結(jié)構(gòu),時(shí)鐘系統(tǒng)投用后,先后多次由于時(shí)鐘信號(hào)錯(cuò)誤導(dǎo)致DCS控制系統(tǒng)二層出現(xiàn)不同程度故障事件,根據(jù)運(yùn)行技術(shù)規(guī)范要求,機(jī)組被迫由KIC模式切換到BUP模式運(yùn)行,甚至降功率運(yùn)行,嚴(yán)重危及機(jī)組的安全。通過(guò)對(duì)事件原因進(jìn)行深入分析研究,找出時(shí)鐘設(shè)備、系統(tǒng)固有缺陷,提出優(yōu)化改進(jìn)措施,提高時(shí)鐘系統(tǒng)運(yùn)行可靠性。針對(duì)“華龍一號(hào)”5/6號(hào)機(jī)組的時(shí)鐘系統(tǒng),系統(tǒng)在供電、檢測(cè)控制模塊、校時(shí)、時(shí)鐘檢測(cè)等方面均有較大提升與改進(jìn),以保證對(duì)控制系統(tǒng)授時(shí)可靠性。最后對(duì)福清核電全廠的時(shí)鐘系統(tǒng)進(jìn)行期望性的規(guī)劃,其可為各系統(tǒng)提供最精準(zhǔn)的時(shí)鐘基準(zhǔn)信號(hào),保障機(jī)組安全穩(wěn)定運(yùn)行,為后續(xù)核電機(jī)組設(shè)計(jì)、調(diào)試、運(yùn)維提供重要參考經(jīng)驗(yàn)。

關(guān)鍵詞:時(shí)鐘;可靠性;DCS

Abstract: Fuqing Nuclear Power Plant's clock system is used as the master clock for power plants. It provides clock reference signals for important electrical and instrumentation automatic control equipment such as network-related electrical systems, plant-wide DCS systems,and turbine P320 control systems. The safe and stable operation of the system is of great significance. Based on Fuqing nuclear power clock system as the main line, this paper introduces clock system structure of Fuqing nuclear power unit 1-4. After the clock system is putting-in-service proactively, multiple levels of fault events occur in the second layer of the DCS control system due to clock signal errors.According to the operating technical specifications It is required that the unit be forced to switch from KIC mode to BUP mode and even run at reduced power, which seriously endangers the safety of the unit.Through in-depth analysis and research on the causes of the event,the inherent defects of the clock equipment and system are found out,and optimization and improvement measures are proposed to improve the operating reliability of the clock system. As for the clock system of “Hualong No.1” unit 5/6 in the power supply, control module, the school, the clock have significant improvement to ensure the reliability of timing control system. Finally, the clock system of the entire Fuqing nuclear power plant is expected to be planned, which can be for the system to provide the most accurate clock reference signal, guarantee the safe and stable operation of unit, and provide important reference experience for subsequent nuclear power units provide a valuable reference for design, commissioning, operation and maintenance..

Key words: The clock; Reliability; DCS

在線(xiàn)預(yù)覽:福清核電時(shí)鐘系統(tǒng)可靠性研究與提升

摘自《自動(dòng)化博覽》2019年12月刊

熱點(diǎn)新聞

推薦產(chǎn)品

x
  • 在線(xiàn)反饋
1.我有以下需求:



2.詳細(xì)的需求:
姓名:
單位:
電話(huà):
郵件:
主站蜘蛛池模板: 国产精品99久久久久久www | 亚洲三级黄色片 | 在线视频国产网址你懂的在线视频 | 亚洲全网成人资源在线观看 | 欧美特黄一级片 | 欧美国产亚洲精品a第一页 欧美国产亚洲一区 | 国产日韩欧美中文字幕 | 天天看天天摸色天天综合网 | 青青久久精品国产免费看 | 99久久99 | 国产一区二区播放 | 国产羞羞的视频在线观看免费 | 国产亚洲情侣久久精品 | 日本大片久久久高清免费看 | 国产一级特黄老妇女大片免费 | 黄色激情毛片 | 久99视频 | 国产原创自拍 | 久久久91精品国产一区二区 | 久久久久久久91精品免费观看 | 在线看日本a毛片 | 国产性生活视频 | 美国一级大黄一片免费的网站 | 一区二区手机视频 | 美国一级毛片视频 | 亚洲精品国产精品国自产网站 | 国产午夜精品一区二区三区嫩草 | 一级毛片免费一级直接观看 | 开心网五月色婷婷综合图片 | 国产成人精品.一二区 | 久久精品视频5 | 网站视频大片www | 99久久精品免费看国产免费 | 久久精品国产99久久72 | 日韩视频免费在线播放 | 亚洲天天综合色制服丝袜在线 | 亚洲精品美女视频 | 欧美一级高清黄图片 | 日本二区免费一片黄2019 | 免费又黄又爽又猛大片午夜 | 日韩欧美在线观看一区 |