久久久91-久久久91精品国产一区二区-久久久91精品国产一区二区三区-久久久999国产精品-久久久999久久久精品

最新廣告
關注中國自動化產業發展的先行者!
工業智能邊緣計算2025年會
CAIAC 2025
2025工業安全大會
OICT公益講堂
當前位置:首頁 >> 案例 >> 案例首頁

案例頻道

福清核電時鐘系統可靠性研究與提升
  • 企業:     領域:嵌入式系統    
  • 點擊數:1859     發布時間:2019-12-31 11:45:48
  • 分享到:

作者:趙穎(福建福清核電有限公司,福建 福州 350300)

摘要:福清核電全廠時鐘系統作為電廠的授時母鐘,為涉網電氣系統、全廠DCS系統、汽輪機P320控制系統等重要電氣、儀控自動控制設備提供時鐘基準信號授時,其可靠性對電廠自動控制系統的安全穩定運行有著重要的意義。本文以福清核電時鐘系統為主線,介紹福清核電1~4號機組時鐘系統結構,時鐘系統投用后,先后多次由于時鐘信號錯誤導致DCS控制系統二層出現不同程度故障事件,根據運行技術規范要求,機組被迫由KIC模式切換到BUP模式運行,甚至降功率運行,嚴重危及機組的安全。通過對事件原因進行深入分析研究,找出時鐘設備、系統固有缺陷,提出優化改進措施,提高時鐘系統運行可靠性。針對“華龍一號”5/6號機組的時鐘系統,系統在供電、檢測控制模塊、校時、時鐘檢測等方面均有較大提升與改進,以保證對控制系統授時可靠性。最后對福清核電全廠的時鐘系統進行期望性的規劃,其可為各系統提供最精準的時鐘基準信號,保障機組安全穩定運行,為后續核電機組設計、調試、運維提供重要參考經驗。

關鍵詞:時鐘;可靠性;DCS

Abstract: Fuqing Nuclear Power Plant's clock system is used as the master clock for power plants. It provides clock reference signals for important electrical and instrumentation automatic control equipment such as network-related electrical systems, plant-wide DCS systems,and turbine P320 control systems. The safe and stable operation of the system is of great significance. Based on Fuqing nuclear power clock system as the main line, this paper introduces clock system structure of Fuqing nuclear power unit 1-4. After the clock system is putting-in-service proactively, multiple levels of fault events occur in the second layer of the DCS control system due to clock signal errors.According to the operating technical specifications It is required that the unit be forced to switch from KIC mode to BUP mode and even run at reduced power, which seriously endangers the safety of the unit.Through in-depth analysis and research on the causes of the event,the inherent defects of the clock equipment and system are found out,and optimization and improvement measures are proposed to improve the operating reliability of the clock system. As for the clock system of “Hualong No.1” unit 5/6 in the power supply, control module, the school, the clock have significant improvement to ensure the reliability of timing control system. Finally, the clock system of the entire Fuqing nuclear power plant is expected to be planned, which can be for the system to provide the most accurate clock reference signal, guarantee the safe and stable operation of unit, and provide important reference experience for subsequent nuclear power units provide a valuable reference for design, commissioning, operation and maintenance..

Key words: The clock; Reliability; DCS

在線預覽:福清核電時鐘系統可靠性研究與提升

摘自《自動化博覽》2019年12月刊

熱點新聞

推薦產品

x
  • 在線反饋
1.我有以下需求:



2.詳細的需求:
姓名:
單位:
電話:
郵件:
主站蜘蛛池模板: 羞羞色院91精品网站| 久久青青草原综合伊人| 一级做a爱过程免费视频时看| 自拍视频国产| 国产一级特黄| 美国黄色网址| 超级碰碰青草久热国产| 久久精品免费| 婷婷六月久久综合丁香76| 在线观看国产精品日本不卡网| 日本xxxwwxxx免费视频| 亚洲成人18| 男人的午夜影院| 国产 日韩 在线 亚洲 字幕 中文| 视频1区| 最新国产大片高清视频| 国产精品精品国产| 精品在线不卡| 免费国产在线观看| 日韩另类在线| 亚洲va久久久久| 亚洲午夜在线| 在线观看国产精成人品| a级毛片免费全部播放| 三级a黄| 久久91视频| 久久精品视频免费| 日本高清中文字幕视频在线| 亚洲成人aaa| 亚洲五月花| 亚洲性图视频| 亚洲第一天堂网| 在线a级| 亚洲精品一区二区三区四| 成人性生活视频| 成人福利在线视频| 成年男女男精品免费视频网站 | 伊人久久青草青青综合| 青青草社区| 免费看a级片| 玖玖精品在线视频|