王彥輝(國電南瑞科技股份有限公司,江蘇 南京 210061)
摘要:本文以鄭州地鐵2號線二期工程綜合監(jiān)控系統(tǒng)接入一期為例,詳細(xì)介紹了延伸線綜合監(jiān)控系統(tǒng)接入既有線的設(shè)計(jì)方案、實(shí)施步驟、風(fēng)險管控措施及應(yīng)急預(yù)案,為國內(nèi)在建的同類型延伸線項(xiàng)目綜合監(jiān)控系統(tǒng)的接入提供參考。
關(guān)鍵詞:城市軌道交通;延伸線;綜合監(jiān)控系統(tǒng)
Abstract: Taking Zhengzhou Metro Line 2 phase II project integrated monitoring system access phase I as an example, this paper introduced the design scheme, implementation procedures, emergency plan and risk control measures of the Integrated Supervision and Control System (ISCS) for extended line to existing line. It provides a good reference for the same kind of extension project in urban rail transit in China.
Key words: Urban rail transit; Extended line; Integrated Supervision and Control System(ISCS)
在線預(yù)覽:城市軌道交通延伸線綜合監(jiān)控系統(tǒng)接入方案研究與實(shí)施.pdf
摘自《自動化博覽》2021年6月刊